 |
Copperbelt Energy Corporation PLC
With a power generation capacity of 80MW, transmission and distribution network of 835 km of overhead power lines, 36 high voltage substations and electricity network carrying capacity in excess 700MW, CEC intends to grow its current share of 50% of the Zambia’s sector to become a dominant operator for the SAPP region. |